Calculate component
DEEN
PURE PARTS – Thermo as the active functional world

Facade · PURE THERMO EXTERIOR

Defined exterior route for facades and existing buildings.

Development route for mineral exterior substrates and weather-exposed components with limited constructive intervention.

D · development status
Problem

Why this route needs its own assessment.

Exterior components require not only thermal function but also protection against weathering, water uptake, UV, freeze-thaw cycling and ageing.

PURE THERMO EXTERIOR describes a system path where the thermal functional layer is embedded in an exterior build-up with a protective layer and finish.

Illustrative exterior route. Weather resistance and system release depend on the tested complete build-up.
System build-up

From substrate to defined build-up.

01Substrate
02Primer
03PURE THERMO
04protective / cover layer
05finish
Schematic representation – not to scale.
Applications

Typical application fields.

Facades

Thermal functional layer within a defined facade system.

mineral substrates

System build-up on suitable concrete, masonry and render surfaces.

existing surfaces

For selected retrofit situations with limited intervention depth.

components with limited intervention

Route for components where constructive intervention must remain limited.

local exterior details

Local junctions and geometrically demanding exterior areas.

Technical assessment

Performance is created in the assessed system context.

  • Test driving rain resistance
  • Test UV and ageing resistance
  • Validate freeze-thaw behaviour
  • Assess water uptake
  • Verify adhesion and substrate strength
Open tests / limits
  • no claim of tested universal durability
  • cover layer and finish must be validated as a system
  • exposure and substrate require project-specific assessment

Is PURE THERMO suitable for your project?

Request technical project assessment